Wednesday, September 3, 2008

A little more progress

Just got a call from S. who will be laying pipes tomorrow. Following the pipes steel mesh can be put down in preparation for the pour.

He will also quote for drain pipes. With our block being very narrow there will not be a lot of access after construction so he suggests it will be easier (cheaper) to trench drainpipes before the frame goes up.

No comments: