Friday, November 28, 2008

One side completed

Today one side is complete and much of the rear lounge area has been completed. 

rear almost complete
P1050767
rear3

rearview2


corner work
P1050759
looking out of garage back door
P1050762

Thursday, November 27, 2008

living area

Despite a bit of rain today there was good progress again. Have being playing around with photo stitching so here is a wide view of the rear living area taken from the kitchen sink location.

The Castillo bricks show up really well in pictures so it is easy to take good shots of all the pipes and fittings for later reference!

P1050698

P1050689

P1050688

P1050687

P1050671

P1050669

Electrical Diagram

Wednesday, November 26, 2008

First wall almost complete


Today we found that great progress had been made and almost the entire side wall completed. Looks like the bricks have even been matched and not just put down at random. Hopefully this rate of work will continue and it will be done quickly.

P1050649
external wall
P1050650
Interior detail of brickwork
P1050654

P1050640

P1050638

P1050637

Tuesday, November 25, 2008

Garage wall complete




Second day of bricking and we think it looks great. Spoke to SS today and he thinks that bricks will be done in about three weeks. Even better they won't be painting the gutters and fascias 'till the very end so we have lots of time to decide on colours. Should be easy to photoshop the gutters in various colours after the bricks are up.

P1050613




P1050614

Meterbox
Meter box


That pool is looking good!
P1050622

Monday, November 24, 2008

Bricking has started


Today we got a nice surprise, dropping in for a quick look we found that the brickies have been and started. Even better the mortar choice looks very nice. Hopefully they can get it done well before Christmas to leave time for the post lockup work.




P1050604 This shows how they have moved all of the bricks into nice piles.


P1050606 Another use for our garage, looks like they have even got a chair!

Friday, November 21, 2008

Roof covering fixed


P1050594
Originally uploaded by sdabel
Dropped in this morning around 11.30 to find the roof had just been finished. Colour (Shoal Grey) looks much better on than on the ground so happy with that. Not sure about the colour selections of the gutters and fascias now so might see about changing them, only paint so should not be difficult.

P1050585

Window to laundry has also been replaced with the correct awning style window. Next stage should be the bricks!Laundry Window

Thursday, November 20, 2008

Windows and external door frames fixed

Today the windows and door frames went in.Bedroom Windows

Kitchen window
Kitchen window is composed of glass bricks and will be at bench height. Should provide light without loss of privacy.

P1050575

Tuesday, November 18, 2008

Plumbing hot and cold fixed

,frToday the plumbing was installed, hot, cold and rainwater and connected to mains so we have a working tap.

We specified a tap for the fridge, interesting that this one tap cost almost twice as much as doubling the entire rainwater piping!
Detail of how the pipes pass through the frame.
Plumbing detail

Plumbing for mixer and shower head in En suite shower.


Rainwater fittings.Pump for rainwater will connect to house lines here. Rainwater will be pumped to toilets and laundry, if rainwater tank is empty or power fails the system will cut over to mains water. 

Colorbond roofing delivered

Today the roofing arrived, looks a bit more grey (Shoal Grey) than I had imagined but there it is! Light colour is to reflect as much heat as possible. Zincalume (galv) is the most reflective but many councils including ours will not approve it.

Saturday, November 15, 2008

Gutters installed


Yesterday (friday 14th) the gutters and facias went up. Makes a real difference to how complete the house looks.



P1050467





P1050469
P1050470

P1050471


P1050473


P1050487


P1050485

Thursday, November 13, 2008

2nd Progress payment made

No action on the building front today but we did pay the second progress payment recieved yesterday.  

Wednesday, November 12, 2008

Window Blocks delivered

These arrived on remembrance day. This is the glass block unit that will go in the kitchen behind the stove top. Lucky for us as the acrylic splash back we are using is not suitable for hot areas.

Monday, November 10, 2008

Windows and sliding doors delivered

Today the windows arrived along with the sliding glass doors. So far they all look to be as specified.

Stack of windows ready for installation.

Today the windows and glass doors arrived.


The two sliding glass doors that will go on the back of the house.