Monday, May 4, 2009

handing over

After being away on a short holiday we are now back and lots has happened.

Handover went very well so we have now taken possesion of the keys! Special thanks to person A (you know who you are).

Appliances have been installed albeit with a couple of problems. Power lead for hotplates is too short so power point will have to be moved.
Under the Kitchen bench


Oven makes a terrible noise when switched on, we supplied this so will have to go back to the supplier.

Gas meter was scheduled for install while we were away but there was a problem with a damaged pipe. So builder is fixing that so we can get a meter fitted.

Solar hot water should be installed but today the panels are not anywhere to be seen on the roof!
Carpets and timber floors all installed so the place is looking better. Pictures to follow soon.



No comments: